Submitted on Saturday 20th February 2016
Published on Monday 22nd February 2016
Current status: Closed
Closed: Monday 22nd August 2016
Signatures: 25
Tagged with
Popularity
This petition has 25 signatures in total, with signatories from 22 constituencies. That makes it the 33,260th most popular petition of all time.
Geography
This petition has a Diversity Rating of 8% (very low) and a Local Issue Rating of 11% (low).
Notes on geography
Signatures by constituency and region don't necessarily add up to the total number of signatures. That's because the petitions system doesn't validate postcodes, and some people mistype them. And without a valid postcode, a signature cannot be allocated to any particular place.
18.227.161.132 Mon, 06 May 2024 19:54:55 +0100