Submitted on Tuesday 17th November 2015
Published on Friday 20th November 2015
Current status: Closed
Closed: Friday 20th May 2016
Signatures: 53
Tagged with
Remove the plutonium stockpile at Sellafield by using the PRISM fast reactor
There is over 100 tonnes of plutonium in storage at Sellafield. It costs the taxpayer £80 million a year to store. The stockpile is a potential danger to the public.
A new nuclear reactor called PRISM could consume the plutonium as fuel, providing clean energy whilst eliminating nuclear waste.
The PRISM is a type of nuclear plant called a fast reactor. It is different to other nuclear reactors in operation today in that it uses fast neutrons. The fast neutrons allow the reactor to consume nuclear waste (including plutonium) as fuel.
PRISM could be built at Sellafield to consume the stockpile of plutonium located there. The reactor would consume plutonium whilst producing low carbon power.
This would also create high-tech jobs and improve the UK technical capability
You can't sign this petition because it is now closed. But you can still comment on it here at Repetition.me!
18.117.8.177 Thu, 21 Nov 2024 14:22:24 +0000