Submitted on Saturday 20th February 2016
Published on Monday 22nd February 2016
Current status: Closed
Closed: Monday 22nd August 2016
Signatures: 25
Tagged with
Popularity ![]()
This petition has 25 signatures in total, with signatories from 22 constituencies. That makes it the 38,948th most popular petition of all time.
Geography ![]()
This petition has a Diversity Rating of 8% (very low) and a Local Issue Rating of 11% (average).
This petition was submitted under the Parliamentary boundaries prior to June 2024, so the names may not be current constituency names
Notes on geography
Signatures by constituency and region don't necessarily add up to the total number of signatures. That's because the petitions system doesn't validate postcodes, and some people mistype them. And without a valid postcode, a signature cannot be allocated to any particular place.
216.73.216.30 Sat, 04 Jul 2026 10:32:58 +0100