Submitted on Wednesday 15th February 2017
Rejected on Friday 24th February 2017
Current status: Rejected
Rejection code: irrelevant (see below for details)
Build a Chepstow bypass to remove the bottle neck from the M48 onto the A48.
The lowering of the Severn Bridge Toll represents a huge oppurtunity for growth in Monmouthshire, Forest of Dean and South East Wales. However the road infrastructure is inadequate. The A48 is already suffering from congestion and poor air quality through the town of Chepstow.
With the addition of new housing estates in both Monmouthshire and Forest of Dean the current proposals fall unacceptably short in facilitating growth.
This scheme has been an aspiration since the 1960s and unless both the Welsh and UK governments finally co-operate and commit then the economic prosperity so within reach will be choked off, instead leaving the quality of the resident's lives to deteriorate and stifle sustainable economic development.
You can't sign this petition because it was rejected. But you can still comment on it here at Repetition.me!
The Government e-Petitions Team gave the following reason:
Your petition is about something that the Welsh Government is responsible for. That means that the UK Government and Parliament can't look into it. Responsibility for roads is devolved in Wales.
The Welsh Assembly has its own Petitions Committee. If you'd like to send your petition to the Welsh Assembly, you can find out more here:
http://www.assembly.wales/en/gethome/e-petitions/Pages/e-petitions.aspx
18.118.137.96 Fri, 22 Nov 2024 01:03:40 +0000