Submitted on Saturday 16th September 2017
Published on Monday 18th September 2017
Current status: Closed
Closed: Sunday 18th March 2018
Signatures: 11
Tagged with
Install ANPR systems on the A2 junction with the A282.
Fewer signatures
More signatures
Colours relate to the distribution of signatures across different constituencies and not to the absolute number.
Constituency boundaries are slightly simplified in order to minimise loading time. More detailed boundaries are shown on individual constituency pages.
3.142.249.105 Thu, 21 Nov 2024 19:28:52 +0000