Submitted on Saturday 29th October 2011
Published on Friday 16th December 2011
Current status: Closed
Closed: Sunday 16th December 2012
Signatures: 12
Tagged with
M11 extension to the Humber Bridge
To help the economy now and in the future extend the M11 from Cambridge, passing to the East of Lincoln, to connect with the Humber Bridge. This will create construction jobs now and relieve congestion on the A1, A14 and many routes through Lincolnshire in the future. It will make sense of both the M11 which stops at Cambridge and the Humber Bridge which is not able to make an operating profit. Connecting the M11 to the Humber Bridge is likely to dramatically increase usage of the bridge and would likely lead to a reduction in road deaths in Lincolnshire.
You can't sign this petition because it is now closed. But you can still comment on it here at Repetition.me!
18.191.233.80 Mon, 18 Nov 2024 17:51:24 +0000