Submitted on Tuesday 11th February 2014
Published on Thursday 13th February 2014
Current status: Closed
Closed: Friday 13th February 2015
Signatures: 2
start dredging from floating craft at outfall of Somerset Levels river now.
There is no need to await the departure of the floods to begin Dredging at once, when, with the removal of financial restrictions by Mr Cameron, floating Dredgers can start work at the sea end of the outfall of the main river and work upstream as soon as they can be brought to site. Dredgings can be dumped at sea to avoid contaminating the land while flooded. The sooner work starts the sooner the floods can be dispersed. Westminster Dredging are experts. I was Agent for the construction of two Jetties on the Thames from floating craft.
You can't sign this petition because it is now closed. But you can still comment on it here at Repetition.me!
13.58.201.240 Sat, 23 Nov 2024 10:06:52 +0000