Change planning laws to require all new-builds to have solar PV and 8KW battery

Petition Details

We need to generate more renewable electricity and this is a way to do it that will be cheap, quick and done at minimal cost.
If every new built house had 4KW of Solar PV and an 8KWh battery, this would add only £5,000 to the purchse price of the house which the owner will get back in free energy

Additional Information

Government is concerned at the cost of creating new generation systems, but central generators need additional infrastructure to distribute the energyu generated.
If a large number of homes generated that energy from a distributed PV infrasturucture (i.e. 1,000s of homes), no additional would be needed.
A change to the planning rules would be very cheap to do, but PV on the 1m homes would add 4 million Megawatts anually (more that 10MW a day) ... for (effectively) nothing. It is a NO BRAINER.


You can't sign this petition because it was rejected. But you can still comment on it here at Repetition.me!

This petition was rejected

The Government e-Petitions Team gave the following reason:

There's already a petition about this issue. We cannot accept a new petition when we already have one about a very similar issue.

You are more likely to get action on this issue if you sign and share a single petition.

You may wish to sign this petition which calls for a similar action: petition.parliament.uk/petitions/640118