Submitted on Friday 16th May 2014
Published on Monday 19th May 2014
Current status: Closed
Closed: Monday 30th March 2015
Signatures: 21
Reopen The Lincolnshire Loop Line - Lincoln to Boston
I want them to carry out a feasibility study on this former railway line that will be needed in the future, we can't go without having our trains for much longer and this route will need to come back into full operations in the future without a doubt in sight. They need to carry the study out in order to determine the cost of reopening the line for passenger and freight traffic once again because it can be done. The line has been gone for far too long now and needs to make a comeback pretty soon.
You can't sign this petition because it is now closed. But you can still comment on it here at Repetition.me!
3.21.246.53 Thu, 21 Nov 2024 13:57:15 +0000